Skip to main content

Industry

Hotel groups

Refurbishing an operating property imposes constraints most building firms know poorly: phased work, limited disturbance, absolute respect for the reopening date.

  • Firms used to working in occupied premises
  • Consistent standards across several properties
  • Planning aligned with seasonality

The works cannot disturb operations

Every lost room-night has an immediate cost, and a poor guest experience affects reputation long afterwards.

Hotel refurbishment almost always runs in phases, during quiet periods, with noise, circulation and cleanliness constraints that do not exist on a new-build site. Not every firm can work in that setting, and the difference does not show in a quote.

The second difficulty is repetition: a group refurbishing several properties wants a consistent outcome to identical standards, while the firms able to work vary from one city to the next.

We identify firms experienced in occupied premises across each of your locations and structure the criteria that keep the result consistent from property to property.

Profiles concerned

  • Multi-property groups

    The stake is a common standard and repeatable operations from site to site.

  • Independent operators

    One or two properties, with no internal technical department to steer contractor selection.

  • Owners of hotel assets

    Structural works coordinated with an operator who stays in place.

  • Residences and outdoor hospitality

    Seasonal works concentrated into very short windows.

What we address

  • Finding firms suited to occupied sites

    We verify real experience in operating environments, not just a hotel reference.

  • Holding the works window

    The ability to mobilise crews over a short period becomes a selection criterion in its own right.

  • Making standards consistent

    A shared criteria book prevents each property from producing a different result.

  • Covering several locations

    We document the firms available city by city.

Our method

We start from the operating calendar, not the works calendar. The available windows determine the type of firm to look for more than the nature of the works does.

We then identify, in each location, the firms whose organisation genuinely allows them to work within those windows, checking their forecast workload for the period.

  • A seasonal reading

    Possible works periods are defined before any contractor search.

  • Verified occupied-site experience

    Interviews focused on specifics: phasing, disturbance, protection of guest areas.

  • A written standard

    A quality and finish framework common to all properties.

Steps

  1. 01

    Programme framing

    Properties concerned, phases envisaged, finish levels expected.

  2. 02

    Operating window analysis

    Periods genuinely available per property.

  3. 03

    Local census

    Firms available in each city of operation.

  4. 04

    Qualification

    Checking occupied-site experience and availability in the target window.

  5. 05

    Standards framework

    Formalising requirements common to all properties.

  6. 06

    Introductions

    Contact with retained firms ahead of the tender.

Expected effects

  • Less operating risk

    Retained firms understand the constraints of an open property.

  • A consistent outcome

    Written standards limit finish differences between properties.

  • A workable schedule

    Contractor availability is verified before reopening dates are committed.

  • Repeatability

    The framework is reused for the next property.

Common mistakes

  • Selecting on a hotel reference alone

    Having worked for a hotel does not mean having worked while it was open.

  • Starting the contractor search too late

    Low-season windows are short: available firms are committed well in advance.

  • Letting each property manage alone

    Without a common standard, quality differences become visible to the group's guests.

Services involved first

  • Consulting

    Structures common standards and occupied-site selection criteria.

  • Business introduction

    Opens relationships with qualified firms in each location.

  • Strategic partnerships

    Establishes durable relationships with firms working across several properties.

Frequently asked questions

Prepare the next refurbishment phase

A first conversation reviews your operating windows and the availability of firms across your locations.

Related stakeholders

Resources

  • Services

    The detail of what we deliver.

  • Contact

    Discuss a refurbishment programme.